- 发行说明
- 入门指南
- 安装
- 配置
- 集成
- 身份验证
- Working with Apps and Discovery Accelerators
- AppOne 菜单和仪表板
- AppOne 设置
- TemplateOne 1.0.0 菜单和仪表板
- TemplateOne 1.0.0 设置
- TemplateOne menus and dashboards
- TemplateOne 2021.4.0 设置
- Purchase to Pay Discovery Accelerator 菜单和仪表板
- 购买到付款 Discovery Accelerator 设置
- Order to cash Discovery Accelerator 菜单和仪表板
- “订单到现金” Discovery Accelerator 设置
- Basic Connector for AppOne
- SAP Connectors
- 适用于 AppOne 的 SAP 订单到现金连接器
- 适用于 AppOne 的 SAP 采购到付款连接器
- SAP Connector for Purchase to Pay Discovery Accelerator
- SAP Connector for Order-to-Cash Discovery Accelerator
- Superadmin
- 仪表板和图表
- 表格和表格项目
- 应用程序完整性
- How to ....
- 使用 SQL 连接器
- Introduction to SQL connectors
- Setting up a SQL connector
- CData Sync extractions
- Running a SQL connector
- Editing transformations
- 释放 SQL 连接器
- Scheduling data extraction
- Structure of transformations
- Using SQL connectors for released apps
- Generating a cache with scripts
- Setting up a local test environment
- Separate development and production environments
- 实用资源

Process Mining 用户指南
合规性 - 截止日期
简介
The Compliance – Due dates dashboard displays information regarding activities not meeting deadlines.

如果要使用“合规性 - 截止日期”仪表板,则必须在TemplateOne中加载Due dates表的属性。请参阅TemplateOne 的输入表- 截止日期。
到期日期
In UiPath Process Mining, a due date is defined as an activity that needs to occur before a specified date. Due dates are used to get information regarding cases meeting or not meeting deadlines and the related costs. Due dates can be predefined to set a significant stage or activity deadline in your processes.
实际日期与预期日期
A due date checks the difference between the Actual date of the event and the Expected date of the event.
The Actual date is defined as the date when the event actually takes place. To create a proper due date, you should also define the Expected date for the due date, which is the date when the event is expected to take place. The Days late expression calculates the difference between the Actual date and the Expected date.
上下文信息
The context bar at the top of the Compliance - Due dates dashboard displays context information and KPI's.
以下是上下文栏元素的说明。
| 元素 | 描述 |
|---|---|
| 平均延迟天数 | 在预计结束日期之后完成活动所需的平均天数。 |
| 延迟的事件的百分比 | 在选定期间内预计结束日期之后完成的事件百分比。 |
| 事件数 | 事件评论总数。 |
| 案例数 | 案例总数。 |
是否在到期日准时完成?
Below is a description of the metrics that can be selected in the Is the due date being met on time? dashboard item. See the illustration below.

以下是元素的说明。
| 指标 | 描述 |
|---|---|
| 平均延迟天数 | 在预计结束日期之后完成活动所需的平均天数。 |
| 延迟百分比 | 在选定期间内预计结束日期之后完成的事件百分比。 |
分布
The Distribution chart enables you to analyze the frequency of due dates based on the number of days late. See the illustration below.