- Release Notes
- Getting Started
- Setup and Configuration
- Automation Projects
- Dependencies
- Types of Workflows
- File Comparison
- Automation Best Practices
- Source Control Integration
- Debugging
- The Diagnostic Tool
- Workflow Analyzer
- About Workflow Analyzer
- ST-NMG-001 - Variables Naming Convention
- ST-NMG-002 - Arguments Naming Convention
- ST-NMG-004 - Display Name Duplication
- ST-NMG-005 - Variable Overrides Variable
- ST-NMG-006 - Variable Overrides Argument
- ST-NMG-008 - Variable Length Exceeded
- ST-NMG-009 - Prefix Datatable Variables
- ST-NMG-011 - Prefix Datatable Arguments
- ST-NMG-012 - Argument Default Values
- ST-NMG-016 - Argument Length Exceeded
- ST-DBP-002 - High Arguments Count
- ST-DBP-003 - Empty Catch Block
- ST-DBP-007 - Multiple Flowchart Layers
- ST-DBP-020 - Undefined Output Properties
- ST-DBP-023 - Empty Workflow
- ST-DBP-024 - Persistence Activity Check
- ST-DBP-025 - Variables Serialization Prerequisite
- ST-DBP-026 - Delay Activity Usage
- ST-DBP-027 - Persistence Best Practice
- ST-DBP-028 - Arguments Serialization Prerequisite
- Variables
- Arguments
- Imported Namespaces
- Control Flow
- Object Repository
- Logging
- The ScaleCoordinates Migration Tool
- The ScreenScrapeJavaSupport Tool
- StudioPro
- Extensions
- Troubleshooting
To exemplify how you can best use the Delay activity, let's create an automation that writes two messages to the Output panel, with a delay of 20 seconds between them.
-
Create a new flowchart.
-
Add a Write Line activity and connect it to the Start node.
-
Select the activity, and in the Text field, type "This is the start time."
-
Add a Delay activity and connect it to the previously added activity.
-
Select the activity, and in the Properties panel, in the Duration field, type 00:00:20. This is the 20 seconds delay that is going to be between the two logged messages.
-
Add another Write Line activity and connect it to the previously added activity.
-
In the Text field, type "Message delayed by 20 seconds.".
The final project should look as in the following screenshot.
-
Press F5. The automation is executed. Note that, in the Output panel, the two messages added in the Write Line activities are written twenty seconds apart.